• About Us
  • Privacy Policy
  • Contact Us
Sunday, June 15, 2025
MyPublisher24
No Result
View All Result
  • Home
  • News
  • Business
  • Entertainment
  • Politics
  • Sports
  • Crime
  • Health
  • World News
  • Features & Opinions
  • Home
  • News
  • Business
  • Entertainment
  • Politics
  • Sports
  • Crime
  • Health
  • World News
  • Features & Opinions
No Result
View All Result
Morning News
No Result
View All Result
Home News

VRA announces major renovation of Kpong Dam after 40 years

MyPublisher24 by MyPublisher24
October 28, 2024
in News
0
Volta River
0
SHARES
12
VIEWS
Share on FacebookShare on TwitterWhatsapp

The Volta River Authority (VRA), has announced the renovation of the 160-megawatt hydroelectric Kpong Dam and spillway gates in Akuse in the Eastern Region, after more than 40 years of its construction.

The announcement was made at a stakeholders’ engagement meeting that included chiefs, assembly members, and opinion leaders from Akuse, Torgome, Fodzoku, Natriku, and surrounding areas.

READ ALSO

ActionAid Ghana makes strides in combating child marriage

Israel-Iran conflict cause of D-levy suspension – Energy Ministry

The meeting, which discussed implications of the project, aimed to elicit ideas from the communities about their concerns and ways to mitigate the project’s potential positive and negative impacts.

In an interview with the Ghana News Agency, Mr. Kwaku Wiafe, VRA’s Director of Engineering Services, explained the goal of engaging stakeholders and community members, saying, it was meant to inform them about the planned Kpong Dam restoration project.

He explained that the project aimed to rehabilitate the dyke because the dam was a rock-filled dam. Through the action of water waves on the rocks over 40 years, some of them had been displaced along the entire length.

He stated that they initially intended to repair it, but they soon realized that adding a fresh layer of rocks would transform it into a new dam, extending its lifespan.

“Since the dam at Akuse only permits water from Akosombo to pass and if the water is coming from Akosombo, the spillway must be prepared to allow it to pass, otherwise it will overtop it, which is why we must ensure that our spillways are extremely dependable in light of climate change and other issues,” he said.

He added that “So the reliability of the spillways is critical to the dam’s safety, and by improving the stability of the dyke and the reliability of the spillways, the overall safety of the dam is enhanced, which goes a long way towards protecting both downstream communities and ensuring that the asset’s integrity is maintained so that Ghanaians can continue to benefit from a reliable power supply.”

In addition, the director said that VRA was also going to rehabilitate the deplorable 10-kilometre road from Okwenya Junction to Akuse for haulage trucks and other motor vehicles.

He mentioned that this decision came after agitation from both VRA staff, the natives of Akuse, and other motorists. The road would be improved into a first-class road.

Some of the stakeholders raised concerns about some fish species going extinct and potential water pollution but in response, Mr. Wiafe explained that the way and manner the work was going to be done would not cause water pollution.

It would not also affect fishing because they were not going to use the fishing landing site, and also those that haulage trucks would not be allowed to go beyond 15 kilometres per hour speed limit.

The road would be watered regularly to suppress dust.

Mr. Emmanuel Darko Thompson, a civil engineer at VRA, stated in a presentation that they intended to restore the upstream dykes as well as the spillway gate.

He noted that the objective was not to replace the gate, but rather to restore it, particularly the corroded gates.

He mentioned that they had planned to restore the dykes with 150,000 cubic meters of rocks.

“If we don’t repair the dam’s dykes and it collapses, it will impact everyone in the nation as well as productivity and economic growth,” he added.

Mr. Ibrahim Mahama, the assembly member for Akuse, urged the VRA to extend the road restoration project to Asutuare

GNA

Tags: Volta River

Related Posts

acitionaid ghana
News

ActionAid Ghana makes strides in combating child marriage

June 15, 2025
John Abdulai,Isareal-Iran,d-levy
Main

Israel-Iran conflict cause of D-levy suspension – Energy Ministry

June 15, 2025
Western Region,galamsey,
Health

Minister admits 12 out of 14 districts suffering from galamsey

June 15, 2025
Sam George,ICT,Volta Region,
News

Sam George tours ICT Training centres

June 15, 2025
FIFA Club World Cup
News

Messi’s Inter Miami held by Al Ahly at FIFA Club World Cup

June 15, 2025
Footballer
News

2025 Ghana Football Awards: Thomas Partey adjudged Footballer of the Year

June 15, 2025
Next Post
House pursuant, Speaker Alban, Alban Sumana, Presidential Aide, announced that, Professionals Forum, The Speaker, questioned the, Alban Bagbin,

Bagbin rallies Speakers of African Parliaments to fight poverty

POPULAR NEWS

Lighthouse chapel

Lighthouse Chapel Case: 6 Ex-Pastors Demand $12 Million Settlement

April 30, 2023
aircraft

Light House Brouhaha: Kofi Bentil Exposed Over $12M Settlement Deal

April 24, 2023
SSNIT Exonerates Lighthouse; Six Renegade EX-Pastors Shamed

SSNIT Exonerates Lighthouse; Six Renegade EX-Pastors Shamed

April 24, 2023
Kwaku Azar writes: Until a prima facie case is established

Akufo-Addo Nominates Gertrude Torkornoo As New Chief Justice

June 12, 2025
Lighthouse Brouhaha: Larry Odonkor charged with Stealing

Lighthouse Brouhaha: Larry Odonkor charged with Stealing

April 24, 2023

EDITOR'S PICK

Multinational company shuts down Ghana plant over benchmark, other issues

Multinational company shuts down Ghana plant over benchmark, other issues

January 14, 2022
NPP confident

NPP confident of victory in 2024 elections

April 2, 2024
lithium, galamsey, boundary commission, Green Ghana Day, Abu Jinapor, June 9, tree seedlings, Otumfuo Osei Tutu II,

Committee on Lands to grill Jinapor over Ghana Boundary C’ssion

May 10, 2023
laundering, seizure, bank accounts, appear in court, Cecilia Abena Dapaah

AG throws out OSP’s request for money laundering probe against Cecilia Dapaah

May 2, 2024

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Important Links

  • Home
  • News
  • Business
  • Entertainment
  • Politics
  • Sports
  • Crime
  • Health
  • World News
  • Features & Opinions

Recent Posts

  • ActionAid Ghana makes strides in combating child marriage
  • Israel-Iran conflict cause of D-levy suspension – Energy Ministry
  • Minister admits 12 out of 14 districts suffering from galamsey
  • Sam George tours ICT Training centres

Archives

  • About
  • Privacy Policy
  • Terms of Use

© 2025 mypublisher24 - All rights reserved.

No Result
View All Result
  • Home
  • News
  • Business
  • Entertainment
  • Politics
  • Sports
  • Crime
  • Health
  • World News
  • Features & Opinions

© 2025 mypublisher24 - All rights reserved.