• About Us
  • Privacy Policy
  • Contact Us
Sunday, June 15, 2025
MyPublisher24
No Result
View All Result
  • Home
  • News
  • Business
  • Entertainment
  • Politics
  • Sports
  • Crime
  • Health
  • World News
  • Features & Opinions
  • Home
  • News
  • Business
  • Entertainment
  • Politics
  • Sports
  • Crime
  • Health
  • World News
  • Features & Opinions
No Result
View All Result
Morning News
No Result
View All Result
Home News

Ghana Gas signs US$700 million deal for second gas processing plant

Osumanu Al-Hassan by Osumanu Al-Hassan
February 3, 2023
in News
0
Ghana Gas signs US$700 million deal for second gas processing plant
0
SHARES
116
VIEWS
Share on FacebookShare on TwitterWhatsapp

The Ghana National Gas Company (GNGC) on Friday signed a Project Implementation Agreement with its joint venture partners to construct a second Gas Processing Plant (GPP Train 2) at an estimated cost of US$700 million.

The gas plant would be sited at Atuabo in the Ellembele District of the Western Region and expected to be completed within 24 months.

READ ALSO

ActionAid Ghana makes strides in combating child marriage

Israel-Iran conflict cause of D-levy suspension – Energy Ministry

It would generate 1,500 direct and indirect jobs within the Atuabo power enclave.

At the signing ceremony in Accra, Dr Benjamin K. D. Asante, the Chief Executive Officer (CEO) of the GNGC, initialed for the Ghana Gas while Dr Hilton John Mitchell, a representative of the Consortium, comprising the Integrated Logistics Bureau Limited, Jonmoore International, Phoenix Park Limited and African Finance Corporation, signed for the rest of the partners.

The construction of a second train gas processing plant with a nominal capacity of 150 million standard cubic feet per day (MMscfd), expandable to 300 MMscfd, to process incremental raw gas volumes from the Greater Jubilee and TEN fields.

The project formed part of the GNGC’s strategic development plan and expected to increase the national gas processing capacity to 450 MMscfd.

The new gas processing facility will process raw gas with natural gas liquids (NGLs) being fractionated into pure components like propane, butane, pentane and stabilised condensate components from the Jubilee and TEN Fields.

The lean gas containing methane and ethane shall be tied-in into the lean gas export from existing GPP Train 1 and delivered into the onshore export pipes.

Some of the components of the GPP Train 2 include the construction of a 150 MMscfd capacity processing plant, expandable to 300 MMscfd, a storage facility, an additional compressor package at Atuabo Mainline Compressor Station and provision of utilities and liquid waste treatment system.

Speaking at the signing ceremony, Mr Kennedy Ohene Agyapong, the Board Chairman of Ghana Gas, said the project, upon completion, would enhance the operations of the GNGC and further boost the utilisation of the country’s gas resources for the Government’s industrialisation agenda.

Mr Agyapong, also Member of Parliament for Assin Central, said the facility would play a critical role to help Ghana achieve her energy transition objectives of using renewable energy sources for industrial purposes and reduce the global carbon emissions.

Dr Asante, the CEO of Ghana Gas, said the project would enable it to become a fully integrated gas services company and provide reliable supply of gas and gas derivatives in Ghana and West African Sub-region.

It would further fulfill the Company’s vision of supplying gas in a cost-effective and environmentally friendly manner, he said.

The new plant, upon coming on stream, he said, would improve the output of liquids processed from natural gas to 80 per cent, compared to the existing facility, which produced between 40 and 50 per cent of gas liquids.

Dr Asante added that the plant would help the nation to generate more megawatts of electricity and ultimately resolve the perennial power outages (dumsor) experienced in Ghana.

The by-products from the processed gas, he explained, could be used to manufacture fertilizer, which would boost the agriculture industry and ultimately reduce the country’s fertilizer import.

Mr Egyapa Mercer, a Deputy Minister of Energy, on his part, said the project would be a useful additional infrastructure in the country’s power generation system.

It would also support the government’s efforts in providing an alternative power supply to drive socio-economic development, he added.

Dr Hilton John Mitchell, who spoke on behalf of the joint venture partners, expressed the Consortium’s commitment to work collaboratively with the GNGC to deliver the gas processing plant on schedule and in a cost-effective manner.

The Ghana National Gas Company was established in July 2011 as a limited liability company with the responsibility to build, own and operate natural gas infrastructure required for gathering, processing, transportation and marketing of gas.
GNA

Source: GNA
Tags: Ghana Gasprocessing plant

Related Posts

acitionaid ghana
News

ActionAid Ghana makes strides in combating child marriage

June 15, 2025
John Abdulai,Isareal-Iran,d-levy
Main

Israel-Iran conflict cause of D-levy suspension – Energy Ministry

June 15, 2025
Western Region,galamsey,
Health

Minister admits 12 out of 14 districts suffering from galamsey

June 15, 2025
Sam George,ICT,Volta Region,
News

Sam George tours ICT Training centres

June 15, 2025
FIFA Club World Cup
News

Messi’s Inter Miami held by Al Ahly at FIFA Club World Cup

June 15, 2025
Footballer
News

2025 Ghana Football Awards: Thomas Partey adjudged Footballer of the Year

June 15, 2025
Next Post
German Finance Minister calls on G20 to form Creditor Committee on Ghana’s debts

German Finance Minister calls on G20 to form Creditor Committee on Ghana’s debts

POPULAR NEWS

Lighthouse chapel

Lighthouse Chapel Case: 6 Ex-Pastors Demand $12 Million Settlement

April 30, 2023
aircraft

Light House Brouhaha: Kofi Bentil Exposed Over $12M Settlement Deal

April 24, 2023
SSNIT Exonerates Lighthouse; Six Renegade EX-Pastors Shamed

SSNIT Exonerates Lighthouse; Six Renegade EX-Pastors Shamed

April 24, 2023
Kwaku Azar writes: Until a prima facie case is established

Akufo-Addo Nominates Gertrude Torkornoo As New Chief Justice

June 12, 2025
Lighthouse Brouhaha: Larry Odonkor charged with Stealing

Lighthouse Brouhaha: Larry Odonkor charged with Stealing

April 24, 2023

EDITOR'S PICK

Full list of NPP leadership for 8th Parliament

Full list of NPP leadership for 8th Parliament

January 5, 2021
NPP wishes Muslims fruitful Ramadam fasting

Kwadwo Owusu Afriyie: John Boadu’s acknowledgement of Mumuni Bawumia at the 29th Anniversary of NPP is a blasphemous blackmail

August 12, 2021
GRA, fuel levy

Bulk oil distributors deny imminent fuel shortage

January 15, 2025
Water crisis: Accra’s population has outgrown our capacity – GWCL

Water crisis: Accra’s population has outgrown our capacity – GWCL

January 22, 2024

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Important Links

  • Home
  • News
  • Business
  • Entertainment
  • Politics
  • Sports
  • Crime
  • Health
  • World News
  • Features & Opinions

Recent Posts

  • Afenyo-Markin challenges Deputy Speaker’s ruling: Says sub judice rule was misapplied
  • ActionAid Ghana makes strides in combating child marriage
  • Israel-Iran conflict cause of D-levy suspension – Energy Ministry
  • Minister admits 12 out of 14 districts suffering from galamsey

Archives

  • About
  • Privacy Policy
  • Terms of Use

© 2025 mypublisher24 - All rights reserved.

No Result
View All Result
  • Home
  • News
  • Business
  • Entertainment
  • Politics
  • Sports
  • Crime
  • Health
  • World News
  • Features & Opinions

© 2025 mypublisher24 - All rights reserved.